Filters
Categories
Search

Elstar EM300 Upright Back Bar

£686.00

600 x 520 x 1872 mm W/D/H

Elstar EM500 Upright Back Bar

£977.00

920 x 520 x 1872 mm W/D/H

Framec DOLCE VITA 4 Scoop Ice Cream Display

£2,227.00

654 x 665 x 1030 mm W/D/H

Framec J7E Scoop Ice Cream Display

£1,878.00

1341 x 723 x 1253 mm W/D/H

Framec J9E Scoop Ice Cream Display

£2,232.00

1656 x 723 x 1253 mm W/D/H

Framec SLANT510 Scoop Ice Cream Display

£1,557.00

1341 x 725 x 1235 mm W/D/H

Framec SUPER SUNNY14 Wall Site Multideck With Doors

£3,290.00

1335 x 737 x 1987 mm W/D/H

Framec SUPER SUNNY19 Wall Site Multideck With Doors

£4,260.00

1885 x 737 x 1987 mm W/D/H

Framec VENERE NS Glass Display Freezer

£2,134.00

668 x 773 x 2000 mm W/D/H

Framec VENERE NV Glass Display Freezer or Chiller

£2,370.00

668 x 773 x 2000 mm W/D/H

Framec VENERE PS Refrigerated Glass Display

£2,171.00

668 x 773 x 2000 mm W/D/H

MAFIROL Counter Top Display Case 1050mm Wide

£2,365.27 +vat

1050 x 1035 x 740 W/D/H

MAFIROL Counter Top Display Case 1300mm Wide

£2,742.38 +vat

1300 x 1035 x 740 W/D/H

MAFIROL Counter Top Display Case 1510mm Wide

£3,008.10 +vat

1510 x 1035 x 740 W/D/H

MAFIROL Counter Top Fish Display 1050mm Wide

£2,203.66 +vat

1050 x 1035 x 400 W/D/H

MAFIROL Counter Top Fish Display 1050mm Wide

£2,397.30 +vat

1050 x 1035 x 740 W/D/H

MAFIROL Counter Top Fish Display 1300mm Wide

£2,475.93 +vat

1300 x 1035 x 400 W/D/H

MAFIROL Counter Top Fish Display 1300mm Wide

£2,733.64 +vat

1300 x 1035 x 740 W/D/H

MAFIROL Counter Top Fish Display 1510mm Wide

£2,644.82 +vat

1510 x 1035 x 400 W/D/H

MAFIROL Counter Top Fish Display 1510mm Wide

£3,013.92 +vat

1510 x 1035 x 740 W/D/H

MAFIROL Display Case with Base 1050mm Wide

£2,395.85 +vat

1050 x 855 x 1240 W/D/H

MAFIROL Display Case with Base 1300mm Wide

£2,781.69 +vat

1300 x 855 x 1240 W/D/H

MAFIROL Display Case with Base 1510mm Wide

£2,989.17 +vat

1510 x 855 x 1240 W/D/H

MAFIROL Double Door 1350mm Wide

£5,936.84 +vat

1350 x 887 x 2035 W/D/H

MAFIROL Double Door 1350mm Wide

£4,780.05 +vat

1350 x 887 x 2035 W/D/H

MAFIROL Double Door 1550mm Wide

£6,766.76 +vat

1550 x 887 x 2035 W/D/H

MAFIROL Double Door 1550mm Wide

£5,360.26 +vat

1550 x 887 x 2035 W/D/H

MAFIROL Four Door 2600mm Wide

£8,358.90 +vat

2600 x 887 x 2035 W/D/H

MAFIROL Fresh Fish Display 1050mm Wide

£2,630.99 +vat

1050 x 855 x 1240 W/D/H

MAFIROL Fresh Fish Display 1300mm Wide

£2,978.98 +vat

1300 x 855 x 1240 W/D/H

MAFIROL Fresh Fish Display 1510mm Wide

£3,204.66 +vat

1510 x 855 x 1240 W/D/H

MAFIROL Low Glass Display Counter 1050mm Wide

£2,277.18 +vat

1050 x 855 x 900 W/D/H

MAFIROL Low Glass Display Counter 1300mm Wide

£2,620.80 +vat

1300 x 855 x 900 W/D/H

MAFIROL Low Glass Display Counter 1510mm Wide

£2,791.15 +vat

1510 x 855 x 900 W/D/H

MAFIROL Low Glass Fish Display 1050mm Wide

£2,439.53 +vat

1050 x 855 x 900 W/D/H

MAFIROL Low Glass Fish Display 1300mm Wide

£2,728.54 +vat

1300 x 855 x 900 W/D/H

MAFIROL Low Glass Fish Display 1510mm Wide

£2,914.91 +vat

1510 x 855 x 900 W/D/H

MAFIROL Low Height Multideck 1310mm Wide

£3,993.81 +vat

1310 x 630 x 1500 W/D/H

MAFIROL Low Height Multideck 1312mm Wide

£4,118.30 +vat

1312 x 852 x 1500 W/D/H

MAFIROL Low Height Multideck 1510mm Wide

£4,365.82 +vat

1510 x 630 x 1500 W/D/H

MAFIROL Low Height Multideck 1512mm Wide

£4,507.05 +vat

1512 x 852 x 1500 W/D/H

MAFIROL Low Height Multideck 1935mm Wide

£5,069.79 +vat

1935 x 630 x 1500 W/D/H

MAFIROL Low Height Multideck 1937mm Wide

£5,240.87 +vat

1937 x 852 x 1500 W/D/H

MAFIROL Low Height Multideck 2562mm Wide

£6,921.82 +vat

2562 x 852 x 1500 W/D/H

MAFIROL Low Height Multideck 685mm Wide

£2,818.82 +vat

685 x 630 x 1500 W/D/H

MAFIROL Low Height Multideck 687mm Wide

£3,168.26 +vat

687 x 852 x 1500 W/D/H

MAFIROL Low Height Multideck 866mm Wide

£3,449.99 +vat

866 x 630 x 1500 W/D/H

MAFIROL Low Height Multideck 868mm Wide

£3,555.55 +vat

868 x 852 x 1500 W/D/H

MAFIROL Painted Steel Tiered Display 1330mm Wide

£3,869.32 +vat

1330 x 620 x 1940 W/D/H

MAFIROL Painted Steel Tiered Display 1330mm Wide

£4,341.06 +vat

1330 x 877 x 1940 W/D/H

MAFIROL Painted Steel Tiered Display 1330mm Wide

£4,141.59 +vat

1330 x 877 x 1940 W/D/H

MAFIROL Painted Steel Tiered Display 1530mm Wide

£4,662.11 +vat

1530 x 877 x 1940 W/D/H

MAFIROL Painted Steel Tiered Display 1530mm Wide

£4,504.86 +vat

1530 x 877 x 1940 W/D/H

MAFIROL Painted Steel Tiered Display 1955mm Wide

£4,844.84 +vat

1955 x 620 x 1940 W/D/H

MAFIROL Painted Steel Tiered Display 1955mm Wide

£5,634.72 +vat

1955 x 877 x 1940 W/D/H

MAFIROL Painted Steel Tiered Display 1955mm Wide

£5,236.50 +vat

1955 x 877 x 1940 W/D/H

MAFIROL Painted Steel Tiered Display 2580mm Wide

£7,504.95 +vat

2580 x 877 x 1940 W/D/H

MAFIROL Painted Steel Tiered Display 2580mm Wide

£7,074.70 +vat

2580 x 877 x 1940 W/D/H

MAFIROL Painted Steel Tiered Display 705mm Wide

£2,936.75 +vat

705 x 620 x 1940 W/D/H

MAFIROL Painted Steel Tiered Display 705mm Wide

£3,116.57 +vat

705 x 877 x 1940 W/D/H

MAFIROL Painted Steel Tiered Display 886mm Wide

£3,302.94 +vat

886 x 620 x 1940 W/D/H

MAFIROL Painted Steel Tiered Display 886mm Wide

£3,602.87 +vat

886 x 877 x 1940 W/D/H

MAFIROL Painted Steel Tiered Display 886mm Wide

£3,418.69 +vat

886 x 877 x 1940 W/D/H

MAFIROL Slim Tiered Display 1350mm Wide

£3,703.34 +vat

1350 x 685 x 1944 W/D/H

MAFIROL Slim Tiered Display 1550mm Wide

£3,958.86 +vat

1550 x 685 x 1944 W/D/H

MAFIROL Slim Tiered Display 1975mm Wide

£4,627.90 +vat

1975 x 685 x 1944 W/D/H

MAFIROL Slim Tiered Display 725mm Wide

£2,882.88 +vat

725 x 685 x 1944 W/D/H

MAFIROL Slim Tiered Display 906mm Wide

£3,096.18 +vat

906 x 685 x 1944 W/D/H

MAFIROL Stainless Steel Multideck 1310mm Wide

£4,415.32 +vat

1310 x 665 x 1920 W/D/H

MAFIROL Stainless Steel Multideck 1310mm Wide

£5,053.05 +vat

1310 x 740 x 1994 W/D/H

MAFIROL Stainless Steel Multideck 1310mm Wide

£4,544.90 +vat

1310 x 855 x 1920 W/D/H

MAFIROL Stainless Steel Multideck 1310mm Wide

£4,202.74 +vat

1310 x 665 x 1920 W/D/H

MAFIROL Stainless Steel Multideck 1510mm Wide

£4,728.36 +vat

1510 x 665 x 1920 W/D/H

MAFIROL Stainless Steel Multideck 1510mm Wide

£5,445.44 +vat

1510 x 740 x 1994 W/D/H

MAFIROL Stainless Steel Multideck 1510mm Wide

£4,870.32 +vat

1510 x 855 x 1920 W/D/H

MAFIROL Stainless Steel Multideck 1935mm Wide

£5,453.45 +vat

1935 x 665 x 1920 W/D/H

MAFIROL Stainless Steel Multideck 1935mm Wide

£6,361.99 +vat

1935 x 740 x 1994 W/D/H

MAFIROL Stainless Steel Multideck 1935mm Wide

£5,821.09 +vat

1935 x 855 x 1920 W/D/H

MAFIROL Stainless Steel Multideck 2560mm Wide

£7,734.27 +vat

2560 x 855 x 1920 W/D/H

MAFIROL Stainless Steel Multideck 685mm Wide

£3,276.73 +vat

685 x 665 x 1920 W/D/H

MAFIROL Stainless Steel Multideck 685mm Wide

£3,427.42 +vat

685 x 855 x 1920 W/D/H

MAFIROL Stainless Steel Multideck 866mm Wide

£3,567.93 +vat

866 x 665 x 1920 W/D/H

MAFIROL Stainless Steel Multideck 866mm Wide

£4,247.15 +vat

866 x 740 x 1994 W/D/H

MAFIROL Stainless Steel Multideck 866mm Wide

£3,723.72 +vat

866 x 855 x 1920 W/D/H

MAFIROL Stainless Steel Tiered Display 1330mm Wide

£4,215.85 +vat

1330 x 620 x 1940 W/D/H

MAFIROL Stainless Steel Tiered Display 1330mm Wide

£4,492.49 +vat

1330 x 877 x 1940 W/D/H

MAFIROL Stainless Steel Tiered Display 1530mm Wide

£4,681.77 +vat

1530 x 620 x 1940 W/D/H

MAFIROL Stainless Steel Tiered Display 1530mm Wide

£4,868.86 +vat

1530 x 877 x 1940 W/D/H

MAFIROL Stainless Steel Tiered Display 1955mm Wide

£5,366.09 +vat

1955 x 620 x 1940 W/D/H

MAFIROL Stainless Steel Tiered Display 1955mm Wide

£5,694.42 +vat

1955 x 877 x 1940 W/D/H

MAFIROL Stainless Steel Tiered Display 2580mm Wide

£7,735.00 +vat

2580 x 877 x 1940 W/D/H

MAFIROL Stainless Steel Tiered Display 705mm Wide

£3,122.39 +vat

705 x 620 x 1940 W/D/H

MAFIROL Stainless Steel Tiered Display 705mm Wide

£3,323.32 +vat

705 x 877 x 1940 W/D/H

MAFIROL Stainless Steel Tiered Display 886mm Wide

£3,599.96 +vat

886 x 620 x 1940 W/D/H

MAFIROL Stainless Steel Tiered Display 886mm Wide

£3,615.25 +vat

886 x 877 x 1940 W/D/H

MAFIROL Triple Door 1975mm Wide

£8,384.38 +vat

1975 x 887 x 2035 W/D/H

MAFIROL Triple Door 1975mm Wide

£6,573.11 +vat

1975 x 887 x 2035 W/D/H

MAFIROL White Painted Steel Tiered Display 1530mm Wide

£4,216.58 +vat

1530 x 620 x 1940 W/D/H

Serrco by TEFCOLD Cooling Unit KSC-720 E

£754.00

Serrco by TEFCOLD KSC-720E High-end KEG Storage Cooler

£2,235.00

745 x 745 x 1340 mm W/D/H

Serrco by TEFCOLD SCL-2222GMU+ High-end Backbar Cooler

£3,295.00

2200 x 560 x 820 mm W/D/H

Serrco by TEFCOLD SCL-2222MU+ High-end Backbar Cooler

£2,925.00

2200 x 560 x 820 mm W/D/H

Serrco by TEFCOLD SCL-222GMU+ High-end Backbar Cooler

£2,740.00

1720 x 560 x 820 mm W/D/H

Serrco by TEFCOLD SCL-222MU+ High-end Backbar Cooler

£2,464.00

1720 x 560 x 820 mm W/D/H

Serrco by TEFCOLD SCL-22GMU+ High-end Backbar Cooler

£2,401.00

1245 x 560 x 820 mm W/D/H

Serrco by TEFCOLD SCL-22MU+ High-end Backbar Cooler

£2,217.00

1245 x 560 x 820 mm W/D/H

Serrco by TEFCOLD SCL-2GMU+ High-end Backbar Cooler

£1,853.00

770 x 560 x 820 mm W/D/H

Serrco by TEFCOLD SCL-2MU+ High-end Backbar Cooler

£1,772.00

770 x 560 x 820 mm W/D/H

Serrco by TEFCOLD SCL-X2 High-end Neutral Backbar

£1,068.00

475 x 550 x 820 mm W/D/H

Serrco by TEFCOLD SCL-X22 High-end Neutral Backbar

£1,680.00

950 x 550 x 820 mm W/D/H

Serrco by TEFCOLD SFK-2E+ High-end KEG Cooler, Machine Unit Right

£1,491.00

620 x 580 x 840 mm W/D/H

Serrco by TEFCOLD SFK-4E+ High-end KEG Cooler, Machine Unit Right

£1,637.00

880 x 580 x 840 mm W/D/H

Serrco by TEFCOLD SFK-4EL+ High-end KEG Cooler, Machine Unit Left

£1,637.00

880 x 580 x 840 mm W/D/H

Serrco by TEFCOLD SFK-6E+ High-end KEG Cooler, Machine Unit Right

£2,058.00

1110 x 580 x 840 mm W/D/H

Serrco by TEFCOLD SFK-6EL+ High-end KEG Cooler, Machine Unit Left

£2,058.00

1110 x 580 x 840 mm W/D/H

Serrco by TEFCOLD SFK-8E+ High-end KEG Cooler, Machine Unit Right

£2,194.00

1350 x 580 x 840 mm W/D/H

Serrco by TEFCOLD SFK-8EL+ High-end KEG Cooler, Machine Unit Left

£2,194.00

1350 x 580 x 840 mm W/D/H

Serrco by TEFCOLD SFK-MU+ L Machine Cooling Unit, Left

£676.00

Serrco by TEFCOLD SFK-VS+ L Evaporator Unit, Left

£584.00

Serrco by TEFCOLD SFK/SCL-MU+ R Machine Cooling Unit, Right

£676.00

Serrco by TEFCOLD SFK/SCL-VS+ R Evaporator Unit, Right

£584.00

Serrco by TEFCOLD SGD-120LE High-end Backbar Cooler

£1,413.00

555 x 615 x 850 mm W/D/H

Serrco by TEFCOLD SGD-120LGE High-end Backbar Cooler

£1,413.00

555 x 640 x 850 mm W/D/H

Serrco by TEFCOLD SGD-120RE High-end Backbar Cooler

£1,413.00

555 x 615 x 850 mm W/D/H

Serrco by TEFCOLD SGD-120RGE High-end Backbar Cooler

£1,413.00

555 x 640 x 850 mm W/D/H

Serrco by TEFCOLD SGD-240E High-end Backbar Cooler

£1,857.00

1110 x 600 x 840 mm W/D/H

Serrco by TEFCOLD SGD-240GE High-end Backbar Cooler

£1,857.00

1110 x 620 x 840 mm W/D/H

Serrco by TEFCOLD SGD-300E High-end Storage Chiller

£2,174.00

600 x 580 x 1805 mm W/D/H

Serrco by TEFCOLD SGD-300GE High-end Display Chiller

£2,174.00

600 x 575 x 1805 mm W/D/H

Serrco by TEFCOLD SGD-360E High-end Backbar Cooler

£2,497.00

1670 x 600 x 840 mm W/D/H

Serrco by TEFCOLD SGD-360GE High-end Backbar Cooler

£2,497.00

1670 x 620 x 840 mm W/D/H

Serrco by TEFCOLD SKB-10 High-end KEG Cooler

£2,461.00 +vat

2200 x 975 x 1080 mm W/D/H

Serrco by TEFCOLD SKB-2 High-end KEG Cooler

£1,403.00 +vat

1060 x 710 x 1080 mm W/D/H

Serrco by TEFCOLD SKB-3.1 High-end KEG Cooler

£1,638.00

1465 x 710 x 1080 mm W/D/H

Serrco by TEFCOLD SKB-4 High-end KEG Cooler

£1,489.00 +vat

1060 x 975 x 1080 mm W/D/H

Serrco by TEFCOLD SKB-4.1 High-end KEG Cooler

£1,998.00

1870 x 710 x 1080 mm W/D/H

Serrco by TEFCOLD SKB-6 High-end KEG Cooler

£1,816.00 +vat

1465 x 975 x 1080 mm W/D/H

Serrco by TEFCOLD SKB-8 High-end KEG Cooler

£1,927.00 +vat

1870 x 975 x 1080 mm W/D/H

Serrco by TEFCOLD SKB-FC Evaporator unit – Fancoil for SKB

£0.00 +vat

Serrco by TEFCOLD SKB-MU High-end Machine Cooling Unit, Top

£946.00

Serrco by TEFCOLD SKB-MU50R High-end Machine Cooling Unit, Right

£1,375.00

Serrco by TEFCOLD VDK-38S

£1,223.00

Serrco by TEFCOLD VDK-50S

£1,526.00

TEFCOLD 1100CHV WH Island Site Freezer

£1,912.00

2500 x 960 x 780 mm W/D/H

TEFCOLD 750CHV WH Island Site Freezer

£1,414.00

1550 x 960 x 780 mm W/D/H

TEFCOLD 900CHV WH Island Site Freezer

£1,546.00

2050 x 960 x 780 mm W/D/H

TEFCOLD Atom Maxi C1DB Glass Door Merchandiser

£1,359.00 £941.00

750 x 710 x 2003 mm W/D/H

TEFCOLD Atom Maxi C1DBB Glass Door Merchandiser

£1,101.00

750 x 710 x 2003 mm W/D/H

TEFCOLD Atom Maxi C1DS Glass Door Merchandiser

£1,359.00 £941.00

750 x 710 x 2003 mm W/D/H

TEFCOLD Atom Maxi C2DB Glass Door Merchandiser

£2,063.00 £1,428.00

1253 x 710 x 2003 mm W/D/H

TEFCOLD Atom Maxi C2DBB Glass Door Merchandiser

£1,692.00

1253 x 710 x 2003 mm W/D/H

TEFCOLD Atom Maxi C2DS Glass Door Merchandiser

£2,063.00 £1,428.00

1253 x 710 x 2003 mm W/D/H

TEFCOLD Atom Maxi C3DB Glass Door Merchandiser

£2,887.00 £1,998.00

1880 x 710 x 2003 mm W/D/H

TEFCOLD Atom Maxi C3DBB Glass Door Merchandiser

£2,399.00

1880 x 710 x 2003 mm W/D/H

TEFCOLD Atom Maxi C3DS Glass Door Merchandiser

£2,887.00 £1,998.00

1880 x 710 x 2003 mm W/D/H

TEFCOLD Atom Maxi F1DB Display Freezer

£2,140.00 £1,481.00

750 x 760 x 2003 mm W/D/H

TEFCOLD Atom Maxi F1DBB Display Freezer

£1,681.00

750 x 760 x 2003 mm W/D/H

TEFCOLD Atom Maxi F1DS Display Freezer

£2,140.00 £1,481.00

750 x 760 x 2003 mm W/D/H

TEFCOLD Atom Maxi F2DB Display Freezer

£2,209.00

1253 x 760 x 2003 mm W/D/H

TEFCOLD Atom Maxi F2DBB Display Freezer

£2,458.00

1253 x 760 x 2003 mm W/D/H

TEFCOLD Atom Maxi F2DS Display Freezer

£3,090.00 £2,138.00

1253 x 760 x 2003 mm W/D/H

TEFCOLD Atom Maxi F3DB Display Freezer

£2,834.00

1880 x 760 x 2003 mm W/D/H

TEFCOLD Atom Maxi F3DBB Display Freezer

£3,198.00

1880 x 760 x 2003 mm W/D/H

TEFCOLD Atom Maxi F3DS Display Freezer

£3,963.00 £2,742.00

1880 x 760 x 2003 mm W/D/H

TEFCOLD BA11H Back Bar Cooler

£443.00

600 x 545 x 900 mm W/D/H

TEFCOLD BA21H Back Bar Cooler

£892.00 £603.00

900 x 545 x 900 mm W/D/H

TEFCOLD BA21S Back Bar Cooler

£917.00 £603.00

900 x 533 x 900 mm W/D/H

TEFCOLD BA31H Back Bar Cooler

£1,172.00 £718.00

1350 x 545 x 900 mm W/D/H

TEFCOLD BA31S-3 Backbar Cooler

£1,226.00 £718.00

1350 x 533 x 900 mm W/D/H

TEFCOLD BA6H Back Bar Cooler

£601.00 £402.00

500 x 545 x 870 mm W/D/H

TEFCOLD BC145 Undercounter Chiller

£527.00 £336.00

503 x 567 x 850 mm W/D/H

TEFCOLD BC25CP Counter Top Chiller

£335.00

332 x 423 x 618 mm W/D/H

TEFCOLD BC30 Counter Top Chiller

£298.00

356 x 430 x 491 mm W/D/H

TEFCOLD BC60 Counter Top Chiller

£375.00

432 x 533 x 668 mm W/D/H

TEFCOLD BC85 Glass Door Merchandiser

£510.00 £337.00

503 x 567 x 775 mm W/D/H

TEFCOLD BELLINI 1250 BM VVR Hot Serve Over Counter

£2,843.00

1300 x 825 x 1290 mm W/D/H

TEFCOLD BELLINI ID 1250FV SR Serveover Display

£2,558.00

1300 x 825 x 1290 mm W/D/H

TEFCOLD BELLINI ID 1650FV SR Serveover Display

£3,036.00

1700 x 825 x 1290 mm W/D/H

TEFCOLD BELLINI ID 2050FV SR Serveover Display

£3,605.00

2100 x 825 x 1290 mm W/D/H

TEFCOLD BELLINI ID 850FV SR Serveover Display

£2,329.00

900 x 825 x 1290 mm W/D/H

TEFCOLD BELLINI Table 1000 Serveover Display

£1,388.00

1050 x 825 x 900 mm W/D/H

TEFCOLD BELLINI TABLE 700 Serve Over Counter

£1,112.00

750 x 825 x 900 mm W/D/H

TEFCOLD BELLINI TOWER 1250 Serveover Display

£1,883.00

1300 x 825 x 1290 mm W/D/H

TEFCOLD BELLINI TOWER 510 Serve Over Counter

£1,388.00

560 x 825 x 1290 mm W/D/H

TEFCOLD BELLINI TOWER 850 Serveover Display

£1,595.00

900 x 825 x 1290 mm W/D/H

TEFCOLD BF850I Upright Freezer

£1,751.00

740 x 990 x 2090 mm W/D/H

TEFCOLD BHC100X1 Bottle Chest Cooler

£877.00

1005 x 565 x 910 mm W/D/H

TEFCOLD BHC150X1 Bottle Chest Cooler

£1,007.00

1505 x 565 x 910 mm W/D/H

TEFCOLD BHC200X1 Bottle Chest Cooler

£1,271.00

2005 x 565 x 910 mm W/D/H

TEFCOLD BHC250X1 Bottle Chest Cooler

£1,578.00

2505 x 565 x 930 mm W/D/H

TEFCOLD BLCB10X1 Blast Chiller/Freezer

£3,801.00 £2,509.00

800 x 877 x 1665 mm W/D/H

TEFCOLD BLCB3X1 Blast Chiller/Freezer

£2,665.00 £1,759.00

800 x 877 x 840 mm W/D/H

TEFCOLD BLCB5X1 Blast Chiller/Freezer

£3,151.00 £2,080.00

800 x 877 x 840 mm W/D/H

TEFCOLD BRABANT 100 Serve Over Counter

£1,926.00

953 x 973 x 1235 mm W/D/H

TEFCOLD BRABANT 150 Serve Over Counter

£2,407.00

1453 x 973 x 1235 mm W/D/H

TEFCOLD BRABANT 200 Serve Over Counter

£2,949.00

1953 x 973 x 1235 mm W/D/H

TEFCOLD BTA54-B1 /UK Impulse Can Cooler

£297.00

456 x 456 x 832 mm W/D/H

TEFCOLD BTA76-B1 /UK Impulse Can Cooler

£312.00

456 x 456 x 1076 mm W/D/H

TEFCOLD BTA80-B1 Impulse Can Cooler

£327.00

569 x 569 x 832 mm W/D/H

TEFCOLD CAF1250 Gastronorm Upright Freezer

£2,990.00 £1,678.00

1314 x 845 x 2130 mm W/D/H

TEFCOLD CAF1390 Upright Freezer

£3,095.00 £1,736.00

1800 x 745 x 1950 mm W/D/H

TEFCOLD CAF410 Upright Freezer

£1,511.00 £848.00

600 x 745 x 1950 mm W/D/H

TEFCOLD CAF650 Gastronorm Upright Freezer

£2,022.00 £1,134.00

730 x 800 x 2065 mm W/D/H

TEFCOLD CAF900 Upright Freezer

£1,762.00

1200 x 745 x 1950 mm W/D/H

TEFCOLD CAR1250 Gastronorm Solid Door Refrigerator

£2,570.00 £1,414.00

1314 x 845 x 2130 mm W/D/H

TEFCOLD CAR1390 Solid Door Refrigerator

£2,780.00 £1,529.00

1800 x 745 x 1950 mm W/D/H

TEFCOLD CAR410 Solid Door Refrigerator

£1,311.00 £722.00

600 x 745 x 1950 mm W/D/H

TEFCOLD CAR650 Gastronorm Solid Door Refrigerator

£1,731.00 £953.00

730 x 800 x 2065 mm W/D/H

TEFCOLD CAR900 Solid Door Refrigerator

£2,255.00 £1,241.00

1200 x 745 x 1950 mm W/D/H

TEFCOLD CC77 BLACK Impulse Can Cooler

£350.00

567 x 567 x 830 mm W/D/H

TEFCOLD CEV425 BLACK Glass Door Merchandiser

£886.00 £585.00

595 x 600 x 1840 mm W/D/H

TEFCOLD CEV425 BLACK L/H Glass Door Merchandiser

£886.00 £585.00

595 x 600 x 1840 mm W/D/H

TEFCOLD CEV425CP BLACK Glass Door Merchandiser

£644.00

595 x 645 x 1980 mm W/D/H

TEFCOLD CEV425CP Glass Door Merchandiser

£557.00

595 x 640 x 1980 mm W/D/H

TEFCOLD CEV435 BLACK Glass Door Merchandiser

£724.00

595 x 640 x 1840 mm W/D/H

TEFCOLD CEV435CP 2 LED Glass Door Merchandiser

£731.00

595 x 640 x 1980 mm W/D/H

TEFCOLD CEV435CP BLACK Glass Door Merchandiser

£742.00

595 x 640 x 1980 mm W/D/H

TEFCOLD CF701 SL Ice Cream Freezer, Solid lids

£667.00

2059 x 725 x 834 mm W/D/H

TEFCOLD CF7210 Gastronorm Counter Freezer

£1,554.00 £1,025.00

1360 x 700 x 960 mm W/D/H

TEFCOLD CF7310 Gastronorm Counter Freezer

£1,873.00 £1,236.00

1795 x 700 x 980 mm W/D/H

TEFCOLD CF7410 Gastronorm Counter Freezer

£2,189.00 £1,444.00

2230 x 700 x 980 mm W/D/H

TEFCOLD CF78 Impulse Freezer

£386.00

569 x 569 x 830 mm W/D/H

TEFCOLD CHOPIN 1000 FV-VP Black Chilled Display Cabinet

£3,491.00

1050 x 800 x 1300 mm W/D/H

TEFCOLD CHOPIN 1000 FV-VP Chilled Display Cabinet

£3,402.00

1050 x 800 x 1300 mm W/D/H

TEFCOLD CHOPIN 1250 FV-VP Chilled Display Cabinet

£3,615.00

1300 x 800 x 1300 mm W/D/H

TEFCOLD CHOPIN 1500 FV-VP Chilled Display Cabinet

£3,970.00

1550 x 800 x 1300 mm W/D/H

TEFCOLD CHOPIN 700 FV-VP Chilled Display Cabinet

£3,081.00

750 x 800 x 1300 mm W/D/H

TEFCOLD CHOPIN MESA 700 Counter

£1,296.00

750 x 793 x 900 mm W/D/H

TEFCOLD CK7210X1SP Gastronorm Counter

£1,016.00

1360 x 700 x 960 mm W/D/H

TEFCOLD CK7220 Counter Cooler GN1/1

£1,210.00

1360 x 700 x 960 mm W/D/H

TEFCOLD CK7240 Counter Cooler GN1/1

£1,939.00 £1,279.00

1360 x 700 x 960 mm W/D/H

TEFCOLD CK7310X1SP Gastronorm Counter

£1,241.00

1795 x 700 x 960 mm W/D/H

TEFCOLD CK7340 Counter Cooler GN1/1

£1,533.00

1795 x 700 x 960 mm W/D/H

TEFCOLD CK7360 Counter Cooler GN1/1

£1,707.00

1795 x 700 x 960 mm W/D/H

TEFCOLD CK7410X1SP Gastronorm Counter

£1,476.00

2230 x 700 x 960 mm W/D/H

TEFCOLD CKC4 KEG Cooler

£1,230.00 £812.00

880 x 590 x 860 mm W/D/H

TEFCOLD CKC6 KEG Cooler

£1,045.00

1110 x 590 x 860 mm W/D/H

TEFCOLD CKC8 KEG Cooler

£1,726.00 £1,140.00

1350 x 590 x 860 mm W/D/H

TEFCOLD Cold Room 120x120x220 Cold Room Panels

£1,808.00

1200 x 1200 x 2200 mm W/D/H

TEFCOLD Cold Room 120x120x220 Cold Room Panels

£2,008.00

1200 x 1200 x 2200 mm W/D/H

TEFCOLD Cold Room 120x150x220 Cold Room Panels

£1,932.00

1200 x 1500 x 2200 mm W/D/H

TEFCOLD Cold Room 120x150x220 Cold Room Panels

£2,320.00

1200 x 1500 x 2200 mm W/D/H

TEFCOLD Cold Room 120x180x220 Cold Room Panels

£2,129.00

1200 x 1800 x 2200 mm W/D/H

TEFCOLD Cold Room 120x180x220 Cold Room Panels

£2,530.00

1200 x 1800 x 2200 mm W/D/H

TEFCOLD Cold Room 120x210x220 Cold Room Panels

£2,264.00

1200 x 2100 x 2200 mm W/D/H

TEFCOLD Cold Room 120x210x220 Cold Room Panels

£2,661.00

1200 x 2100 x 2200 mm W/D/H

TEFCOLD Cold Room 120x240x220 Cold Room Panels

£2,702.00

1200 x 2400 x 2200 mm W/D/H

TEFCOLD Cold Room 120x240x220 Cold Room Panels

£3,212.00

1200 x 2400 x 2200 mm W/D/H

TEFCOLD Cold Room 120x270x220 Cold Room Panels

£2,881.00

1200 x 2700 x 2200 mm W/D/H

TEFCOLD Cold Room 120x270x220 Cold Room Panels

£3,418.00

1200 x 2700 x 2200 mm W/D/H

TEFCOLD Cold Room 120x300x220 Cold Room Panels

£3,605.00

1200 x 3000 x 2200 mm W/D/H

TEFCOLD Cold Room 120x300x220 Cold Room Panels

£3,780.00

1200 x 3000 x 2200 mm W/D/H

TEFCOLD Cold Room 150x150x220 Cold Room Panels

£2,079.00

1500 x 1500 x 2200 mm W/D/H

TEFCOLD Cold Room 150x150x220 Cold Room Panels

£2,560.00

1500 x 1500 x 2200 mm W/D/H

TEFCOLD Cold Room 150x180x220 Cold Room Panels

£2,309.00

1500 x 1800 x 2200 mm W/D/H

TEFCOLD Cold Room 150x180x220 Cold Room Panels

£2,748.00

1500 x 1800 x 2200 mm W/D/H

TEFCOLD Cold Room 150x210x220 Cold Room Panels

£2,425.00

1500 x 2100 x 2200 mm W/D/H

TEFCOLD Cold Room 150x210x220 Cold Room Panels

£3,044.00

1500 x 2100 x 2200 mm W/D/H

TEFCOLD Cold Room 150x240x220 Cold Room Panels

£2,713.00

1500 x 2400 x 2200 mm W/D/H

TEFCOLD Cold Room 150x240x220 Cold Room Panels

£3,265.00

1500 x 2400 x 2200 mm W/D/H

TEFCOLD Cold Room 150x270x220 Cold Room Panels

£2,846.00

1500 x 2700 x 2200 mm W/D/H

TEFCOLD Cold Room 150x270x220 Cold Room Panels

£3,626.00

1500 x 2700 x 2200 mm W/D/H

TEFCOLD Cold Room 150x300x220 Cold Room Panels

£3,069.00

1500 x 3000 x 2200 mm W/D/H

TEFCOLD Cold Room 150x300x220 Cold Room Panels

£4,136.00

1500 x 3000 x 2200 mm W/D/H

TEFCOLD Cold Room 180x150x220 Cold Room Panels

£2,309.00

1800 x 1500 x 2200 mm W/D/H

TEFCOLD Cold Room 180x150x220 Cold Room Panels

£2,748.00

1800 x 1500 x 2200 mm W/D/H

TEFCOLD Cold Room 180x180x220 Cold Room Panels

£2,468.00

1800 x 1800 x 2200 mm W/D/H

TEFCOLD Cold Room 180x180x220 Cold Room Panels

£3,030.00

1800 x 1800 x 2200 mm W/D/H

TEFCOLD Cold Room 180x210x220 Cold Room Panels

£2,603.00

1800 x 2100 x 2200 mm W/D/H

TEFCOLD Cold Room 180x210x220 Cold Room Panels

£3,332.00

1800 x 2100 x 2200 mm W/D/H

TEFCOLD Cold Room 180x240x220 Cold Room Panels

£2,838.00

1800 x 2400 x 2200 mm W/D/H

TEFCOLD Cold Room 180x240x220 Cold Room Panels

£3,916.00

1800 x 2400 x 2200 mm W/D/H

TEFCOLD Cold Room 180x270x220 Cold Room Panels

£3,090.00

1800 x 2700 x 2200 mm W/D/H

TEFCOLD Cold Room 180x270x220 Cold Room Panels

£4,243.00

1800 x 2700 x 2200 mm W/D/H

TEFCOLD Cold Room 180x300x220 Cold Room Panels

£3,285.00

1800 x 3000 x 2200 mm W/D/H

TEFCOLD Cold Room 180x300x220 Cold Room Panels

£4,407.00

1800 x 3000 x 2200 mm W/D/H

TEFCOLD Cold Room 210x210x220 Cold Room Panels

£2,785.00

2100 x 2100 x 2200 mm W/D/H

TEFCOLD Cold Room 210x210x220 Cold Room Panels

£3,664.00

2100 x 2100 x 2200 mm W/D/H

TEFCOLD Cold Room 210x240x220 Cold Room Panels

£3,090.00

2100 x 2400 x 2200 mm W/D/H

TEFCOLD Cold Room 210x240x220 Cold Room Panels

£4,254.00

2100 x 2400 x 2200 mm W/D/H

TEFCOLD Cold Room 210x270x220 Cold Room Panels

£3,313.00

2100 x 2700 x 2200 mm W/D/H

TEFCOLD Cold Room 210x270x220 Cold Room Panels

£4,485.00

2100 x 2700 x 2200 mm W/D/H

TEFCOLD Cold Room 210x300x220 Cold Room Panels

£3,508.00

2100 x 3000 x 2200 mm W/D/H

TEFCOLD Cold Room 210x300x220 Cold Room Panels

£4,685.00

2100 x 3000 x 2200 mm W/D/H

TEFCOLD Cold Room 210x300x220 WD Cold Room Panels 80 mm

£4,470.00

2100 x 3000 x 2200 mm W/D/H

TEFCOLD Cold Room 210x300x220 WD Coldroom Panels 120 mm

£5,089.00

2100 x 3000 x 2200 mm W/D/H

TEFCOLD Cold Room 240x240x220 Cold Room Panels

£3,489.00

2400 x 2400 x 2200 mm W/D/H

TEFCOLD Cold Room 240x240x220 Cold Room Panels

£4,832.00

2400 x 2400 x 2200 mm W/D/H

TEFCOLD Cold Room 240x270x220 Cold Room Panels

£3,757.00

2400 x 2700 x 2200 mm W/D/H

TEFCOLD Cold Room 240x270x220 Cold Room Panels

£5,157.00

2400 x 2700 x 2200 mm W/D/H

TEFCOLD Cold Room 240x270x220 WD Cold Room Panels 80 mm

£4,687.00

2400 x 2700 x 2200 mm W/D/H

TEFCOLD Cold Room 240x270x220 WD Coldroom Panels 120 mm

£5,642.00

2400 x 2700 x 2200 mm W/D/H

TEFCOLD Cold Room 240x300x220 Cold Room Panels

£3,870.00

2400 x 3000 x 2200 mm W/D/H

TEFCOLD Cold Room 240x300x220 Cold Room Panels

£5,357.00

2400 x 3000 x 2200 mm W/D/H

TEFCOLD Cold Room 270x270x220 Cold Room Panels

£4,040.00

2700 x 2700 x 2200 mm W/D/H

TEFCOLD Cold Room 270x270x220 Cold Room Panels

£5,515.00

2700 x 2700 x 2200 mm W/D/H

TEFCOLD Cold Room 270x300x220 Cold Room Panels

£4,249.00

2700 x 3000 x 2200 mm W/D/H

TEFCOLD Cold Room 270x300x220 Cold Room Panels

£5,734.00

2700 x 3000 x 2200 mm W/D/H

TEFCOLD Cold Room 300x300x220 Cold Room Panels

£4,906.00

3000 x 3000 x 2200 mm W/D/H

TEFCOLD Cold Room 300x300x220 Cold Room Panels

£6,737.00

3000 x 3000 x 2200 mm W/D/H

If you have any questions about our products, then please get in touch.  
01922 926123